If failover is required, restore Config backup of PROD Veeam server to DR Veeam server and start failover plans. Have replication jobs run in PROD Veeam server. Setting up replication jobs now and I have thought of 2 options:ġ. We backup many VM's in PROD and we want to replicate some to DR. We have VCenter high availability so all Vmware DataCenters are under 1 vCenter. We have a PROD Veeam server (physical & uses SAN snaps) and a standby DR Veeam Server in a DR site (VM).